316+ Acres
IH-35 & FM 972 Georgetown, Texas
|
For
specific details, contact
Ercel Brashear,
Broker
Representing the Seller
(512) 930-5796 |
 |
(Boundary lines shown are approximate
and are not absolutely accurate) |
 |
Site Map Dallas to San
Antonio
This property is conveniently situated on the
IH-35 corridor in Central Texas. The distance from the site to major cities along
the corridor is approximately:
- Dallas: 170 miles
- Waco: 70 miles
- Austin: 30 miles
- San Antonio: 100 miles
|
 |
Local Site Map Georgetown
- This site is just north of SH-195 and IH-35 intersection.
The sites are on the east side of IH-35 and on both sides of FM 972.
- Northbound exit ramp will discharge traffic onto the frontage
road south of the property before FM 972.
- The on-ramps for northbound IH-35 are located just south
of FM 972 and just north of FM 972 before CR 143.
- Southbound IH-35 traffic can exit onto the frontage road
at the FM 972 exit, proceed under IH-35 on FM 972 to get to either tract via FM
972.
|
 |
Tract #1
- Property wraps the NE corner of IH-35 and FM 972
- The property offers easy accessibility to both north and
southbound IH-35 traffic
- 2006 IH-35 daily traffic counts are reported to be between
43,000 and 55,000 VPD
- 2,620'+ frontage on the northbound frontage road
- 3,260' + frontage on FM 9721,236' frontage on CR 142
- In 2005, TXDOT issued preliminary approval for 3 access points
on IH-35 and 3 access points on FM 972 (see Broker for details)
- Access to Jonah SUD, including fire flow of 1,500 GPM, can
be made available with the completion of system improvements (see
Broker for details).
|
 |
Tract #2
- SE corner of IH-35 and FM 972
- The property offers easy accessibility to both north and
southbound IH-35 traffic
- 2006 IH-35 daily traffic counts are reported to be between
43,000 and 55,000 VPD
- 3,680'+ frontage on the northbound frontage road
- 1,320' + frontage on FM 972
- 3,540' + frontage on CR 196
- In 2005, TXDOT issued preliminary approval for 5 access points
on IH-35 and 1 access points on FM 972 (see Broker for details)
- Access to Jonah SUD, including fire flow of 1,500 GPM, can
be made available with the completion of system improvements (see
Broker for details).
|
 |
Access Ramp Locations
- The sites are on the east side of IH-35 and on both sides
of FM 972.
- Northbound exit ramp will discharge traffic onto the frontage
road south of the property before CR 196.
- The on-ramps for northbound IH-35 are located just south
of FM 972 and just north of FM 972 before CR 143.
- Southbound IH-35 traffic can exit onto the frontage road
at the FM 972 exit, proceed under IH-35 onto FM 972 to get to either tract.
|

(Utility line locations shown are
conceptual. Actual locations will be determined at the time of construction.) |
Utility Overview
Water System Improvements
The property is inside the Jonah Water Special Utility District
service area. Jonah SUD has limited existing infrastructure or retail service
in the immediate area of Owner's property.
In order to provide water service in the area, including the
provision of fire flows of 1,500 GPM for up to two hours to Owner's property,
the Owner has negotiated an Non-Standard Service Contract with Jonah SUD wherein
the Owner has agreed to design and construct utility service improvements, which
will, upon completion, provide up to five hundred (500) Living Unit Equivalents
of domestic water service and fire flows of not less than 1500 gallons per minute
for not less than two hours to the property.
The required utility service improvements consist of:
- A groundwater well, drilled and completed on the property;
together with a fifty-foot-by-fifty-foot well site centered on the well.
- A 200,000 gallon elevated storage tank; together with a 100-foot-by-100-foot
storage tank site.
- Water supply distribution lines necessary to implement the
delivery of water at the perimeter of the Owner's property, including:
- A 12" water main running roughly 3,500 foot along the north
right of way of FM 972 ("FM 972 Line Extension").
- A 12" water main running roughly 4,700 feet from the southwest
corner of Tract #1 to the northwest corner of Tract #1 ("Northwest Line Extension").
- A 12" water main running roughly 5,500 feet from the Elevated
Storage Tank to the southernmost corner of Tract #1 and the southernmost corner
of Tract #2.
- An 8" transmission main running roughly 6,500 feet from the
groundwater well to the elevated storage tank.
All required system improvements will be designed, constructed
and dedicated to Jonah SUD in phases to accommodate the development of the property.
Well
The owner is completing the drilling of a roughly 300' deep
Edward's Aquifer well at the southwest corner of Tract #2. According to the Owner's
engineering consultants, the well will be capable of delivering up to 500 gallons
per minute with no significant drawdown of the water table. The initial pump installed
at the well will be rated at 40 horsepower which will deliver 300 gallons per
minute flow (500 LUE's) to the system. According to the engineers, swapping the
40 HP pump for a 100 horse power variable frequency drive could boost the output
of the well to 500 gallons per minute (833 LUE's). The water pumped will pass
through a chlorine injection system while on the way to the elevated storage tank.
Construction Cost Reimbursements To The Owner
The cost of the well, the elevated storage tank, the transmission
line, the FM 972 line extension, the northwest line extension and the south line
extension are eligible for re-imbursement to the Owner. To protect the investment
by the Owner in the reimbursable items, the District reserves all capacity in
the required improvements for the benefit of the Owner for a period of 10 years
following the date of acceptance of the well, the elevated storage tank, the transmission
line and the south line extension. During the 10-year capacity reservation period,
the Owner is allowed to collect a facilities fee from each applicant for water
service equal to $6,000 time the number of LUE's required to supply water service
to the applicant. Additionally, the Owner will collect up to one-third of the
amount of each connection fee (currently $3,000/connection) paid to Jonah for
all connections made on Owner's property. |
[Click
to return to listing]
| The Broker is submitting the attached information in its
capacity as an agent and representative of the owner. The Broker makes no warranty,
express or implied, as to the accuracy of the information contained herein. All
information submitted is subject to change without notice as regards price, terms
or availability. Additionally, the Broker has conducted no environmental investigation
of the property and makes no representations regarding the environmental status
of the property. The Broker STRONGLY encourages an independent examination of
the property be conducted by representatives of the buyer. |
 |
In accordance with the law, the properties here are offered
without regard to race, color, creed, familial status, national origin, religion,
or handicap status. |
|